Terms and Conditions
- Payments terms: –
- 100% Advance along with order, if it is less than Rs.100000/-.
- 50% advance along with order, 50% before delivery, if it is more than Rs.100000/-
- Validation of quote 30 days, total execution of project should be completed latest by 3 months.
- P.O & Payments should made in the name of SIKKIM HARDWARE CENTRE.
- The prices are based on the sizes provided by the customer. The prices are valid for variation in sizes up to +/- 30mm per window provided the design and style of product remains unchanged. The customer will be charged on pro-rate basis for difference between the actual sizes and given sizes, if any, beyond the above variation.
- After handovering the windows, cleaning not our scope.
- Windows security tape should be remove while installing windows freely, After installation security tape will be removed by us that should be chargeable per window Rs. 100/-.
- If any other commitments given by our sales team, before placing order please call us. Cell: 9832188997
- After handovering windows, If any service require related to windows & doors, that should be chargeable. Per visit – Rs. 350/-
- Material unloading & storage should be your scope.
- All disputes shall be subject SILIGURI jurisdiction only.
Pre-Requisites for installation of Windows:-
- Walls should be plastered from inside and outside, with inside POP complete.
- All jams, sills and soffits should be plastered.
- Flooring (where doors have to be installed) should be complete.
- Aperture should be smooth.
- Base and top of window should be water leveled and sides should be in vertical plump.
- Sill width should be more than the window width.
- Opening should be accessible from inside for installation.
- Grills: Adequate care should be taken if grills have to be installed.
- For Horizontal slider Window: Grill should be provided on the outer face of slider before the installation of the window.
- For Casement windows: Screw type grill is recommended after installation of casement window.
- Installation should happen before the last coat of paint. At least one coat of paint should be done before installation begins.
- Scaffoldings/ bracing should not interrupt the window openings where openings where windows are supposed to be installed.